Electrical Senior Engineer (IOORS/SS7)


Working Conditions

  • Start date 1st week of April 2018
  • Duration 6 Months renewable
  • Client Subsea 7
  • Project Multiple Projects
  • Location Suresnes
  • Country France
  • Posted on 27/03/2018
  • Rotation Scheme NA
  • Reference IOORS/SS7

Main Roles and Responsibilities

  • Involved in the subject area of medium (and low) voltage electrical power systems and new wire/cable/instrumentation definitions for Top Side or Subsea aspects.
  • POWER CABLES:
    • Perform pre-sizing calculation and technical assessments for different applications:
      • Power supply to Platforms (3-phase AC MV-HV)
      • Wind Turbines power transmission (3-phase AC MV-HV)
      • Tidal Turbines power transmission (3-phase AC MV-HV)
      • Very long power supply for subsea processing (AC or DC HV)
      • Associated cable termination technology survey for the above application
  • TECHNICAL SCOPE OF WORK DOCUMENTS:
    • Prepare / Edit SoW relative to various Topside equipment such as:
      • Feeder Circuit Breaker
      • Power Transformer
      • Electrical shelter with HVAC installed in hazardous areas
      • DTS temperature monitoring
      • Optical Junction Box
      • Line Insulation Monitoring Selection
      • Bus Bar Box
  • ELECTRICAL DESING:
    • Develop and validate ad-hoc tools to perform electrical calculation
    •  

Requirements

  • Engineer specialized in Electricity and Power System sizing.
  • Interested particularly in development and qualification of innovative solutions.

Important Information

  • All information about the job opportunity (including main roles and responsibility) serves in general, as an indication only. The client shall reserve the right to change / modify the information
  • All the requirements are mandatory unless it is described otherwise.
  • Only shortlisted potential candidates will be notified and contacted by IOORS.
  • IOORS will keep your information in our database for more suitable positions in the future.

Share this: