Senior Installation Method Engineer (IOORS/SS7)


Working Conditions

  • Start date ASAP
  • Duration 6 Months
  • Client SUBSEA 7
  • Project Multiple Projects
  • Location Suresnes
  • Country France
  • Posted on 22/04/2019
    (This opportunity has been posted over 2 months ago)
  • Rotation Scheme NA
  • Reference IOORS/SS7

Main Roles and Responsibilities

  • You will be in charge of the installation of subsea structures, mooring systems, risers systems, flexible flowlines and umbilicals. You will prepare the mission and then support the offshore crew during the operation. You will insure the interface with the Client, the suppliers, the offshore crew and the design team.
  • Your main responsibilities will be:
  • You are autonomous in the preparation and Offshore support activities for products installation, You take responsibility for a package and a group of Engineers on a major project,
  • You plan, prepare and confirm the specific procedures (validation test on site, transportation and installation) and associated calculation notes (design lifting slings) defining priorities,
  • You bring technical expertise during the procurement process, and confirm the project's progress at interim meetings with your Lead,
  • You realize the production of all documents and preliminary studies related to tenders and projects developed by the Group.
  • You participate to vessel/CB mobilization as well as installation phases on vessel in order to validate technical solutions by respecting the rules of the Group HSEQ.
  • You warrant that your activities are conducted in compliance with the Project standards in terms of Quality, Cost & Time.
  • You define the training needs of junior engineers, the development of computational tools, and organize technology watch.

Requirements

  • Graduated with a Master of Engineering and at least 6 years minimum of relevant work experience in the petroleum sector or an equivalent industry. Your autonomy, your capacity to coordinate and communicate are key assets to succeed at this position.

  • 6 years minimum Installation Methods experience in Structures, Umbilicals &Flexibles Products
  • Recognized as a leading player in its field, the group is distinguished by its deep offshore projects that require sophisticated technical skills and the use of innovative technologies.
  • Specialized in the realization of turnkey projects for the Energy industry, Subsea 7 designs and implements innovative solutions for bottom to surface connections in the marine environment.





Important Information

  • All information about the job opportunity (including main roles and responsibility) serves in general, as an indication only. The client shall reserve the right to change / modify the information
  • All the requirements are mandatory unless it is described otherwise.
  • Only shortlisted potential candidates will be notified and contacted by IOORS.
  • IOORS will keep your information in our database for more suitable positions in the future.

Share this: